Mechanical Installation - 2N IP Base Installation Manual

Door entry ip intercom
Hide thumbs Also See for IP Base:
Table of Contents

Advertisement

2.2 Mechanical Installation

Surface Mounting
What you need for mounting:
®
2N
IP Base
plus appropriate frames
LAN connection, UTP Cat5e or better with RJ-45 connector
802.3af PoE or 12 V DC / 2 A power supply
Before using this product, please read the instruction manual and follow the
instructions and recommendations contained therein.
Installation procedure:
Choose a location easily accessible to users.
As the intercom is black, do not install it in direct sunlight to avoid overheating.
Verify the cable connecting options – the device has two grommets towards the
wall at the bottom.
Prepare the cables connected to the LAN as well as the power supply and line to
the lock or other accessories if necessary.
Remove the metal frame of the device, open the lower blank module as pointed
by the arrows and insert all the cables. Put the cables through the grommets.
The manufacturer is not liable for defects caused by loss due to insufficient
sealing.
Fit the device to the backplate. You can use a drilling template; download
Plug in the cables, check the functionality of the device.
Replace the blank module and attach the frame.
The figures below show frame demounting and position of the mounting screws.
2N TELEKOMUNIKACE a.s., www.2n.cz
here
.
27/66

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents