Preparing Aap Modules; Preparing Pass-Through Cable Modules - Extron electronics TouchLink TLP Pro 725C Series User Manual

Touchpanel control systems
Hide thumbs Also See for TouchLink TLP Pro 725C Series:
Table of Contents

Advertisement

Preparing AAP Modules

If required, AAPs must be purchased separately. Go to
AAPs that are available.
1.
2.
3.
4.

Preparing Pass-through Cable Modules

4
Figure 8.
1.
2.
3.
4.
5.
Secure up to three single space AAPs in the AAP Frame, using the #4-40 nut with captive
washer provided with the AAP (figure 8,
If required, fill any unused spaces with blank AAP plates.
AAP
1
AAP Frame
#4-40 Nut with
Connectivity
Captive Washer
Module
Figure 7.
Preparing AAP Modules
Insert cables through the bottom of the connectivity module and connect them to the
bottom of the AAPs (
2
).
Secure the AAP frame to the connectivity module, using the four provided #4-40 screws
(
3
).
Insert the AAP module assembly into the Cable Cubby (see
page).
3
2
1
Preparing Pass-through Cable Modules
Pass the cables through the connectivity module from the bottom (see figure 8,
Insert the cable into the grommet plate (
Fill any unused holes with the provided plugs (
Attach the grommet plate to the top of the connectivity module, using four of the provided
#4-40 screws (
).
4
Insert the cable pass-through modules into the Cable Cubby (see
the next page).
www.extron.com
1
).
3
3
3
3
3
2
Installing Modules
2
).
3
).
TLP Pro 725C Series Touchpanels • Mounting
to see the full range of
on the next
1
).
Installing Modules
on
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TouchLink TLP Pro 725C Series and is the answer not in the manual?

This manual is also suitable for:

Touchlink tlp pro 725cTouchlink tlp pro 725c nc

Table of Contents