Eaton 9390 Installation And Operation Manual page 90

40–80 kva ups, integrated distribution cabinet
Hide thumbs Also See for 9390:
Table of Contents

Advertisement

TERMINAL PLUG P1
NOTE : Metal shields covering wiring terminals
must be removed or opened to gain
access to terminals.
9-34
Eaton 9390 IDC (40–80 kVA) Installation and Operation Manual 164201690 Rev Rev 3 www.eaton.com/powerquality
TERMINAL LOCATIONS (80 kVA/208V)
DESCRIPTION:
D
INTERFACE AND CONTROL WIRING
INSTALLATION NOTES AND TERMINAL
LOCATIONS
R
A
W
N I
G
N
: O
164201690---9
REVISION:
B
S
H
E
E
: T
2 of 5
DATE:
082707

Advertisement

Table of Contents
loading

Table of Contents