1.
The IDC equipment operating environment must meet the weight requirements shown in
Table A and size requirements shown in Drawing 164201690 ---10.
2.
The IDC is palleted separately for shipping.
3.
Do not tilt cabinets more than 10° from vertical or they may tip over.
4.
Dimensions are in millimeters (inches).
Table A. Equipment Weight
Component/Model
Eaton 9390 40–80 kVA IDC with Maintenance Bypass
Breaker (MBP) and Maintenance Input Breaker (MIS)
NOTES:
1. For IDC with Transformer, add 331 kg (730 lb).
2. For IDC with Distribution Panels, add 11.3 kg (25 lb) for each panel.
3. For IDC with Distribution Breakers, add 6.8 kg (15 lb) for each breaker.
4. For IDC with Output Lugs, add 2.3 kg (5 lb).
5.
The clearances required around the IDC are shown in Table B.
Table B. IDC Clearances
From Top of Cabinet
From Front of Cabinet
From Back of Cabinet
From Right Side of Cabinet
From Left Side of Cabinet
Eaton 9390 IDC (40–80 kVA) Installation and Operation Manual 164201690 Rev Rev 3 www.eaton.com/powerquality
Shipping
236 (520)
Minimum clearance over the IDC is 457.2 mm
(18 ") for ventilation
914.4 (36 ") for working space
None Required
None Required
152 mm (6 ") for door swing
DESCRIPTION:
PHYSICAL FEATURES AND REQUIREMENTS
D
R
A
W
N I
G
N
: O
164201690---2
REVISION:
A
Weight
kg (lb)
Installed
Point Loading
213 (470)
6 at 35.5 (78.3)