Eaton 9390 Installation And Operation Manual page 66

40–80 kva ups, integrated distribution cabinet
Hide thumbs Also See for 9390:
Table of Contents

Advertisement

NOTE:
1. You MUST remove jumper for dual-feed.
2. If the load requires a neutral, a bypass
neutral feeder must be supplied.
E1, E2, E3
K1
E4. E5
EATON 9390 UPS
CABINET
9-10
Eaton 9390 IDC (40–80 kVA) Installation and Operation Manual 164201690 Rev Rev 3 www.eaton.com/powerquality
RIB–2, RIB–4,
BIB–1, BIB–3,
E6, E7,
SINGLE-FEED
E8, E12
JUMPER
(REMOVE
FOR DUAL
FEED)
K5
E9, E10,
E11, E12
OUTPUT TO
CRITICAL
LOAD
F
K3
OUTPUT TO
CRITICAL
LOAD
F
480/480V
FACTORY-SUPPLIED FOR INTEGRAL
CABINET INSTALLATIONS
OPTIONS
AC INPUT
TO UPS
C
E57, E58,
E
E59
RECTIFIER INPUT
RIB–6
BREAKER CB4 (RIB)
D
BIB–5
BYPASS INPUT
BREAKER CB3 (BIB)
A
E54, E55,
MAINTENANCE
E56
ISOLATION BREAKER
(MIS) CB2
225A
PANELBOARD
NUMBER 2
100---250A
ADJUSTABLE
DISTRIBUTION
BREAKERS
AVAILABLE WITH OPTIONS FOR ONE OR TWO 42-POLE 225A
DISTRIBUTION PANELS, WITH THE SUBSTITUTION OF ONE,
TWO, OR THREE 100---250A ADJUSTABLE FRAME BREAKERS
FOR EACH PANEL, OR A SINGLE OUTPUT TERMINAL BLOCK.
480V INPUT — 208/120V OUTPUT
WITH BIB AND RIB
DESCRIPTION:
IDC ONELINE DRAWINGS
D
R
A
W
N I
G
N
: O
164201690---3
REVISION:
B
AC INPUT
TO BYPASS
B
E51, E52,
EATON
E53
9390 IDC
(OPTIONAL
SINGLE-FEED
JUMPER KIT ---
ORDERED
SEPARATELY)
MAINTENANCE
BYPASS BREAKER
(MBP) CB1
TRANSFORMER
480/208V
225A
PANELBOARD
NUMBER 1
100---250A
ADJUSTABLE
DISTRIBUTION
BREAKERS
OUTPUT
TERMINAL
BLOCK
S
H
E
E
: T
DATE:
082707
OUTPUT TO
CRITICAL
LOAD
F
OUTPUT TO
CRITICAL
LOAD
F
OUTPUT TO
CRITICAL
LOAD
F
6 of 6