Preparing the server for rack conversion

Prerequisites
Before preparing the server for rack conversion make sure you have the following:
• Server
• T-15 screwdriver
Procedure
1. Remove the front bezel.
2. Power down the server.
3. Remove all power:
a. Remove all power:
b. Disconnect each power cord from the server.
4. Rotate the four server feet and place the server on the side.
a. Rotate the server feet.