Installing The Rack-Mount Model To The Tower Conversion Kit - NEC Express5800/R310g-E4 User Manual

Hide thumbs Also See for Express5800/R310g-E4:
Table of Contents

Advertisement

Chapter 2 Preparations

2.3.2 Installing the Rack-mount Model to the Tower Conversion Kit

Follow the procedure below to install the devices to the tower conversion kit.
1. Open the front door of the tower conversion kit.
54
Be sure to observe the following precautions to use the server safely. Failure to
observe the precautions may cause burns, injury, and property damage. For
details, see Safety Precautions and Regulatory Notices.
Do not drop the server.
4U chassis weighs about 15 kgs. At least two persons are required to install
it.
CPU/IO module weighs about 18 kgs. At least two persons are required to
install it.
Do not leave the CPU/IO module of the server being pulled out.
Do not install the CPU/IO module with its cover removed.
Do not install the CPU/IO module while the lock of caster is released.
Do not get your fingers caught.
Note
If the door is locked, use the provided security key to unlock.
Express5800/R310g-E4, R320g-E4, R320g-M4 User's Guide
CAUTION
2. Installation and Connection

Advertisement

Table of Contents
loading

Table of Contents