Download Print this page

Installing The Eye Guard; Installing The Cotton Stand - Brother BAS-341H Instruction Manual

Direct drive programmable electronic pattern sewer
Hide thumbs

Advertisement

3-16. Installing the eye guard

Attach all safety devices before using the sewing machine.
If the machine is used without these devices attached, injury may result.

3-17. Installing the cotton stand

CAUTION
3048B
3533B
BAS-341H, BAS-342H
3. INSTALLATION
(1) Bolt (loosen)
(2) Eye guard (tilt forward)
(3) Eye guard assembly
(4) Plain washers [2 pcs.]
(5) Bolts [2 pcs.]
After installing the eye guard assembly
(3), return the eye guard (2) to its original
angle, and then tighten the bolt (1) to
secure it in place.
(1) Cotton stand
NOTE:
Securely tighten the nut (3) so that
two
washers
(2)
clamped so that the cotton stand (1)
does not move.
are
securely
20

Advertisement

loading

  Also See for Brother BAS-341H

  Related Manuals for Brother BAS-341H

This manual is also suitable for:

Bas-342h