Download Print this page

Brother BAS-341H Instruction Manual page 22

Direct drive programmable electronic pattern sewer
Hide thumbs

Advertisement

3. INSTALLATION
< Motor P. C. board >
3576B
13
Connectors
Upper shaft motor [4-pin]
Synchronizer [10-pin]
3538B
BAS-341H, BAS-342H
Lock the cord clamps
securely.
Connection location on
motor P. C. board
(UVW)
P11 (SYNC)
5. Close the cord presser plate (6) in the direction of the white
arrow, and secure it by tightening the two screws (5).
NOTE:
Close the cord presser plate (6) securely so that no
foreign objects, insects or small animals can get inside
the control box.
6. Check that the cords do not get pulled, and then gently return
the machine head to its original position.
Cord clamps
(4)
(2) (3)

Advertisement

loading

  Also See for Brother BAS-341H

  Related Manuals for Brother BAS-341H

This manual is also suitable for:

Bas-342h