Installing The Two-Pedal Foot Switch; Installing The Cords - Brother BAS-341H Instruction Manual

Direct drive programmable electronic pattern sewer
Hide thumbs Also See for BAS-341H:
Table of Contents

Advertisement

3. INSTALLATION

3-11. Installing the two-pedal foot switch

3-12. Connecting the cords
11
(1) Two-pedal foot switch
(2) Conversion harness
Connect the connector for the two-pedal foot switch (1) to the
conversion harness (2). Insert the conversion harness (2) into
the P15 (PEDAL) connector on the main P.C. board. (Refer to
"3-12. Connecting the cords".)
*
Be sure to make the ground connection. (Refer to "3-13.
Connecting the ground wire".)
<Two-pedal foot switch operating method>
When the work clamp switch (left) is depressed, the work clamp
is lowered, and when the start switch (right) is depressed, the
sewing machine starts sewing.
Work clamp switch (2-step)
3530B
3568B
BAS-341H, BAS-342H
Start switch
1. Remove the cover of the control box.
2. Loosen the two screws (1), and then
open the cord presser plate (2) in the
direction of the arrow.
3. Pass the bundle of cords from the
machine head through the hole in the
table, and then pass it through the
hole in the control box together with
.
the solenoid valve
4. Securely connect the connectors as
indicated in the table.
(Refer to next page)
NOTE:
・ Check that the connector is facing
the correct way, and then insert it
firmly until it locks into place.
・ Secure the cables with cable ties
and cord clamps, while being careful
not to pull on the connector.
4923Q

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bas-342h

Table of Contents