Step 5:
If you are unable to dislodge the plugged material, unbolt discharge chute at
the rotation ring (3) and remove chute from machine to clean out the plugged
material.
Step 6:
Install cleaned discharge chute.
IMPORTANT: Use an appropriate lifting system when removing and installing the
discharge chute. Chute weighs approximately 79 lb (36 kg).
Operate machine, without chipping additional material, to blow out chips
Step 7:
that remain in the chipper housing and discharge chute.