Introduction; Measure And Source Operations; Procedure Overview - GE Druck DPI 620-IS User Manual

Advanced modular calibrator
Table of Contents

Advertisement

3.1 Introduction

3.2 Measure and
source operations

3.2.1 Procedure overview

2
1
TAP
[EN] English - K0460
Chapter 3: Electrical operations
This section gives examples of how to connect and use the
instrument for these operations:
To measure and source electrical values.
Before starting:
Read and understand the
Do not use a damaged instrument.
Note: Use only original parts supplied by the manufacturer.
When using the calibrator for the first time, there are default
measure
and source
Section
2.8.3.
To use the calibrator, complete these procedures:
Set the required calibrator functions on the display: item
A
; see
Section
2.8.3. This includes:
a. CH1: Channel 1 electrical function (measure or source).
b. CH2: Channel 2 electrical function (measure or source).
c. Pressure function (P1 and/or P2): for the MC 620-IS
module carrier, see
pressure stations (P1 only), refer to user manual - K0462.
d. Other functions (maximum: 6 functions).
If necessary, change the Units for the function: item
see
Section 2.8.5
If necessary, set a Utility for the function: item
Section 2.8.6
a. Max/Min/Avg
b. Switch Test
c. Leak Test (pressure options only)
"Safety"
section.
functions on the display; see
Chapter
4; for the PV 62x-IS
Electrical operations 3-1
Issue 1
B
;
C
; see

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents