Chapter 2: Prepare The Instrument; Introduction; Initial Checks; Initial Procedures - GE Druck DPI 620-IS User Manual

Advanced modular calibrator
Table of Contents

Advertisement

2.1 Introduction

2.2 Initial checks

2.3 Initial procedures

2.4 Power supply

[EN] English - K0460

Chapter 2: Prepare the instrument

This chapter gives a description of these items:
the initial checks and procedures
the available power options
the battery and related procedures (install and charge)
the start-up procedures
the menu structure and options
the Process and Automation options available for the
measure and source (
Before using the instrument for the first time:
Make sure that there is no damage to the instrument, and
that there are no parts missing; see
Remove the plastic film that protects the display. Use the
tag (◗ ) in the top right-hand corner.
Before using the instrument for the first time, complete these
procedures:
Charge the battery
Install the fully-charged battery
the cover.
To make sure that the calibration schedule works correctly,
set the date and time; see
This instrument is battery powered:
Ni-MH battery
(Section
available with a fully-charged battery.
)functions
Figure
(Section
2.5.3).
(Section
2.5.2). Then refit
Section 2.8 (Menu
2.5): All the instrument functions are
Prepare the instrument 2-1
1-7.
sequence).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents