Monitor Initialization Processes; Figure 19: Switch Initialization Messages - Allied Telesis IE210L Series Installation Manual

Industrial gigabit ethernet switches
Table of Contents

Advertisement

Monitor Initialization Processes

Verifying release... OK
Booting...
Starting base/first...
Mounting virtual filesystems...
______________
/\ \
/
\ \_
/
\ |
/
\ \
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v0.0.0
Current release filename:IE210L-5.4.6.rel
Original release filename: IE210L-5.4.5.rel
Built: Mon Mar 14 12:15:15 NZDT 2016
Mounting static filesystems...
Checking flash filesystem...
Mounting flash filesystem...
Checking for last gasp debug output...
Checking NVS filesystem...
Formatting NVS...
Mounting NVS filesystem (second attempt)...
Starting base/dbus...
Starting base/syslog...
Starting base/loopback...
Starting base/poe_done...
Starting base/sysctl...
It takes about thirty seconds for the switch to initialize its management
software programs and features, and load the default configuration.
You may also monitor the bootup sequence by connecting a terminal or
computer that has a terminal emulator program, to the console port on the
master switch. You will see the messages from Figure 19 below to Figure
20 on page 52.
____
/ /______\
__/ /| ______ |
|
/
| ______ |
/ /
\ ____ /
Figure 19. Switch initialization messages
IE210L Series Industrial Gigabit Ethernet Switch Installation Guide
[
[
[
[
[
[
[
[
[
[
[
[
[
[
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
OK
]
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie210l-10gpAt-ie210l-18gp

Table of Contents