Sfp Installation; Figure 21: Remove Dust Plug From Sfp Slot; Figure 22: Insert Sfp Transceiver Into Sfp Slot - Allied Telesis IE210L Series Installation Manual

Industrial gigabit ethernet switches
Table of Contents

Advertisement

SFP Installation

Installing one or two SFP transceivers in Ports 9 and/or 10 is optional. If
you choose to install a SFP transceiver, perform the following procedure:
1. Remove the dust plug from an SFP slot. Refer to Figure 21.
Figure 21. Remove Dust Plug From SFP Slot
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in Port 9 (the top slot), position the
transceiver with the Allied Telesis label facing up. If you are installing
the transceiver in Port 10 (the bottom slot), position the transceiver
with the label facing down.
4. Gently slide the transceiver into the SFP slot until it clicks into place as
shown in Figure 22.
Figure 22. Insert SFP Transceiver into SFP Slot
IE210L Series Industrial Gigabit Ethernet Switch Installation Guide
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie210l-10gpAt-ie210l-18gp

Table of Contents