Starting Up; Checks Before Use - ResMed Elisee 350 Clinical Manual

Table of Contents

Advertisement

5.2 Starting up

When the ventilator is running on battery power
1. Press the
which includes:
When the ventilator is running on mains power
As soon as the device is connected to the mains supply, it conducts its self-test. You can then
list the available power supplies, set the flow sensor offsets, and test the occlusion pressure
calculation function (P0.1) (see "Respiratory mechanics parameters" on page 58). Next, the
screen showing the internal and external battery charge indicator will be displayed.
Example of a screen showing the
internal battery charge indicator
Activation button on right side -->
FULL INTERNAL BATTERY IN CHARGE
1. Press the

5.3 Checks before use

Before the ventilator is used for the first time, the user must:
1. Check the power supplies.
2. Check the patient circuit.
3. Perform a manual test.
4. Test the operation of the visual and audible alarms.
Each time the ventilator starts up and after every change in the circuit configuration, only the first
three stages are necessary.
46/102
button on the right-hand side of the device. The device performs its self-test,
Checking available power supplies
Setting the flow sensor offsets
Displaying the language of the software using the ISO 639-1 codes:
(EN: English, DE: German, FR: French, IT: Italian, ES: Spanish, SV: Swedish, NO:
Norwegian).
When the self-test is complete, the device displays the main screen:
Transition to standby takes
Standby mode
place after 60 seconds if the
touch screen is not pressed
Press the
return to the previous screen
button on the right-hand of the device. The main screen is displayed.
Last test the 18/06/10
TEST
TEST
Double cirtcuit : PASS
NEW
NEW
PRESET
PRESET
SETTING
SETTING
SETTING
SETTING
PREVIOUS SETTING
PREVIOUS SETTING
ACV
ACV
Standby screen
Tuesday 13 February
Tuesday 13 February
19:32:45
19:32:45
button to
NOT013281-8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents