Emc-Compatible Installation; Voltage Test; Insulation Measurement - KEB COMBIVERT F6 Instructions For Use Manual

Hide thumbs Also See for COMBIVERT F6:
Table of Contents

Advertisement

bASIc SAFeTy INSTrUcTIONS
Installations with additional safety or protective measures in accordance with their re-
quirements have to be checked, when using drive converters, to be in accordance with
the given application notes or recommendation when using these!

1.4.1 eMc-compatible installation

Observance of the limit values required by EMC law is the responsibility of the manufac-
turer of the installation or machine.

1.4.2 Voltage test

Testing with AC voltage (in accordance with
ecuted, since there is danger for the power semiconductors in the drive converter.

1.4.3 Insulation measurement

An insulation measurement (in accordance with
500 V is permissible, if all power unit connections (grid-connected potential) and all con-
trol connections are bridged with PE. At any unit it can be expected with an insulating
resistance > 20 MΩ !
If personnel protection is required during installation of the
system, suitable protective devices must be used for drive
converters.
www.keb.de/fileadmin/media/Manuals/knowledge/04_techinfo/00_gene-
ral/ti_rcd_0400_0002_gbr.pdf
Notes on EMC-compatible installation can be found here.
www.keb.de/fileadmin/media/Manuals/emv/0000neb0000.pdf
Because of the noise suppression capacitors the test generator will immedi-
ately trigger with current error.
Accordng to
EN 60204-1
ponents. Drive converters of the KEB Automation KG are delivered ex works
voltage tested to 100% according to product standard.
EN 60204-1
Chapter 18.4) may not be ex-
it is permissible to disconnect already tested com-
EN 60204-1
chapter 18.3) with DC
17

Advertisement

Table of Contents
loading

Table of Contents