EFOY Pro 12000 Duo Operation And Installation Manual page 34

Hide thumbs Also See for Pro 12000 Duo:
Table of Contents

Advertisement

Installation
Install a fuse / circuit breaker between the EFOY Pro 12000 Duo and the
batteries in the cables sense + and power +. It should be as close as
possible to the batteries.
Recommended fuse / circuit breaker Power + line:
Type B, rated current at 24 V / 48 V DC: 32 A / 16 A
Recommended fuse / circuit breaker Sense + line:
Type B, rated current at 24 V / 48 V DC: 6 A / 6 A
CAUTION!
High battery capacities can cause high inrush currents.
Compare installed fuse / circuit breaker tripping characteristics with
installed battery parameters.
For a direct safety switch-off in terms of service an emergency switch
should be installed in the power + cable.
1.
Device EFOY Pro 12000 Duo
2.
Cable Sense +
3.
Cable Power +
4.
Cable Power –
5.
Cable Sense –
6.
Earth
7.
Fuse / circuit breaker Power +
8.
Fuse / circuit breaker Sense +
9.
Optional: Emergency switch
10.
Battery 24 V DC / 48 V DC
Page 33

Advertisement

Table of Contents
loading

Table of Contents