CONTROLLER
Date and Time
•
The date/time screen shows the current system date and time (24 hour format). For details on setting the date and time, refer to
Set Date and Time
on page 32.
0A
DD MMM YYYY
HH:MM:SS
Performance Graph
•
The performance graph provides a real-time display of operating performance. Use parameters 8I~8L to select which information
to display.
0000 A
SCR Conduction Bargraph
•
The SCR conduction bargraph shows the level of conduction on each phase.
L1 Cond
L2 Cond
L3 Cond
7.4
Display Calibration
The displayed values for current, voltage and power factor can be calibrated if required. Contact your local supplier for advice.
7.5
Commissioning Menu (Tools)
The Commissioning Menu provides access to commissioning and testing tools.
Press ALT then TOOLS to open the Tools.
The Commissioning Menu is protected by the access code.
The default access code is 0000.
To navigate through the Commissioning Menu:
•
to scroll to the next or previous item, press the
•
to open an item for viewing, press the
to return to the previous level, press the
•
to close the Commissioning Menu, press
•
7.6
Set Date and Time
To set the date and time:
1.
Open the Commissioning Menu.
2.
Scroll to the date/time screen.
3.
Press the
button to enter edit mode.
4.
Press the
and
5.
Use the
and
6.
To save changes, press the
To cancel changes, press the
32
| MVE User Manual (710-17074-00G)
0%-400%
button.
buttons to select which part of the date or time to edit.
buttons to change the value.
button. The MVE will confirm the changes.
button.
or
button.
button.
repeatedly.
Need help?
Do you have a question about the MVE series and is the answer not in the manual?