Setting Table - ABB REC 561 User Manual

Bay level control terminal
Table of Contents

Advertisement

1MRK 580 152-XEN
Page
5 - 30

5.3 Setting table

PARAMETER:
Synchrocheck 1
Operation
InputPhase
(For one-bay version)
UMeasure
(For three-bay version)
USelection
AutoEnerg
ManEnerg
UHigh
ULow
FreqDiff
PhaseDiff
Udiff
tAutoEnerg
tManEnerg
The version for three bays
also includes settings for
SYN2 and SYN3.
Synchronism and energizing
check for single circuit breaker
with voltage selection
SETTING RANGE:
Off, Release, On
L1, L2, L3,
L1 - L2, L2 - L3, L3 - L1
Ph/N, Ph/Ph
SingleBus, DbleBus
Off, DLLB, DBLL,
Off DLLB, DBLL,
Both
(70 - 100)% of Ur/sqr3
(10 - 80)% of Ur/sqr3
(0.05 - 0.30)Hz
(5 - 75)degrees
(5 - 50)% of Ur/sqr3
(0.00 - 1.00)seconds
(0.00 - 1.00)seconds
DESCRIPTION:
Function execution
Voltage reference selection. L1, L2, L3 are
phase-neutral. L1-L2, L2-L3, L3-L1 are
phase-phase
Voltage reference selection, phase-neutral
or phase-phase
Bus arrangement for voltage selection
Both
Auto energizing check:
• Off=Not in use
• DLLB=Dead line live bus
• DBLL=Dead bus live line
• Both=DLLB or DBLL
Manual energizing check:
• Off=Not in use
• DLLB=Dead line live bus
• DBLL=Dead bus live line
• Both=DLLB or DBLL
High-voltage limit
Low-voltage limit
Frequency-difference limit
Phase-difference limit
Voltage-difference limit
Auto-energizing time delay
Manual-energizing time delay
ABB Network Partner AB
Version 1.0-00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents