Flush Mounting - ABB REC 561 User Manual

Bay level control terminal
Table of Contents

Advertisement

1MRK 580 166-XEN
Page
3 - 4

2.1.2 Flush mounting

Installation and commissioning
For flush mounting:
1. Cut and affix the sealing strip, if IP 54 is required (option).
2. Put the terminal in the cut-out.
3. Fasten the side holders to the back part of the terminal with the
small screws (TORX T10 type grip).
4. Fasten the terminal with the big screws
(TORX T25 type grip).
Fig. 3
Flush mounting
ABB Network Partner AB
Version 1.0-00
(X80166-3)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents