Testing - ABB REC 561 User Manual

Bay level control terminal
Table of Contents

Advertisement

1MRK 580 187-XEN
Page
7 - 36

5 Testing

Pulse counter
The test of the Pulse Counter function requires at least a SPA (or LON)
connection to a station MMI including corresponding functionality. A
known number of pulses are with different frequency connected to the
pulse-counter input. The test should be performed for the settings opera-
tion = Off/On and for blocked/deblocked function. The Pulse Counter
value is then read by the station MMI.
ABB Network Partner AB
Version 1.0-00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents