22. Turn the Analyzer on with the main power switch.
23. Enter the installation date for the new resin bed. Press the Menu button, select the
Maintenance tab, press the Consumables button, press the New... button, and then press
the RBed button (see "Setting the Installation or Expiration Date for New Consumables" on
page 190 for additional details, if necessary).
24. Before resuming normal operation, check for leaks.
After resuming normal operation it may take up to four hours for the resin bed to rinse
down; during this time you may experience higher than normal IC values. If high IC values
persist, then you should perform a Conductivity Autozero; follow the instructions in
"Conductivity Autozero" on page 211.
25. After about 12 hours of operation, check the interior of the Analyzer for leaks, and add
water to the DI water reservoir, if necessary.