GE Sievers 900 Series Operation And Maintenance Manual page 184

On-line total organic carbon analyzers
Table of Contents

Advertisement

15. Attach the DI water connector tubing to the bottom of the new resin bed, making sure that
the tab extends through the slot on the set plate by rotating the tubing.
16. Replace the top of the water bottle and fill the DI water reservoir to the fill line with DI
water.
17. Replace the rubber vent cover on the DI water reservoir.
18. Record the installation date for the resin bed in the service log (see Table 18 on page 193).
19. If you need to replace other consumables, follow the procedures listed in the appropriate
sections of this chapter. Otherwise, close and latch the Analyzer door.
20. Turn the Analyzer on with the main power switch.
21. Enter the installation date for the new resin bed. Press the Menu button, select the
Maintenance tab, press the Consumables button, press the New... button, and then press
the RBed button (see "Setting the Installation or Expiration Date for New Consumables" on
page 190 for additional details, if necessary).
22. Before resuming normal operation, check for leaks.
After resuming normal operation it may take up to four hours for the resin bed to rinse
down; during this time you may experience higher than normal IC values. If high IC values
persist, then you should perform a Conductivity Autozero; follow the instructions in
"Conductivity Autozero" on page 211.
23. After about 12 hours of operation, check the interior of the Analyzer for leaks, and add
water to the DI water reservoir, if necessary.
GE Analytical Instruments ©2009
184 of 236
DLM 90488-01 Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents