GE moisture.iq User Manual page 39

Multi-channel moisture and oxygen analyzer
Hide thumbs Also See for moisture.iq:
Table of Contents

Advertisement

1.10Establishing a Gas Flow Through the Oxygen Cell (cont.)
3. Slowly open the flow control valve until the recommended flow of 2 to 2.5 SCFH is established on the
flow meter.
4. When the proper flow is achieved, make sure the relief valve is closed by placing an object (e.g., your
finger, if the gas is non-corrosive) over the relief valve vent. Cover and uncover the relief valve vent and
verify that the flow meter shows no change in the flow rate. Keep the relief valve closed during
operation to minimize leakage in the sample system.
Sample
Gas In
moisture.IQ User's Manual
Optimum Inlet
Pressure Limits
0.2 – 1.0 psig
Flow Control
Valve
Tee
Relief
Valve
Assembly
Figure 22: Gas Flow Schematic
Electrolyte
Reservoir
In
Oxygen Cell
Out
Vent
Sample Gas Outlet and Relief Valve
should vent to atmosphere.
Chapter 1. Installation
Optimum Sample
Flow Range
2.0 – 2.5 SCFH
Sample
Gas Out
Flowmeter
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents