After completing the proper installation of all boards, cables and components, apply power in the
following manner:
1. Apply AC power
2. Connect the battery/secondary power terminals.
3. Do not connect any releasing devices until the releasing circuits have been tested using
simulated loads.
4. Test system as per your requirements.
When servicing the panel, perform the following steps before removing or connecting any power or
supervisory cables:
1. Isolate system from the brigade
2. Disconnect any releasing devices
3. Remove all RS-485 connections
4. Remove battery/secondary power
5. Remove AC power