Upgrade Gateway Module Fieldbus Map - Graco PCF Instructions - Parts Manual

Precision dispense system
Hide thumbs Also See for PCF:
Table of Contents

Advertisement

Maintenance
5. After the red indicator light shuts off, turn off power
to the system.
6. Remove token.
7. Replace access cover.
Upgrade Gateway Module
Fieldbus Map
NOTE: The fieldbus connection is temporarily dis-
abled during the upgrade of a map token. The fol-
lowing instructions apply to all Gateway module
connectors.
1. Remove the access cover.
F
. 35: Remove Access Cover
IG
2. Insert and press map token firmly into slot.
NOTE: There is no preferred orientation of token.
64
Access
Cover
TI12319A
3. Press and hold the push button for three seconds
and then release. The red indicator light (CK) will
flash twice, pause, and then once after the data
map is uploaded.
CK
Token
F
. 36: Insert Token
IG
4. Remove map token (CC) when software has suc-
cessfully uploaded.
5. Replace access cover.
TI12320A
Push Button
313377L

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents