Basic Operation - Dranetz Energy Platform User Manual

Ortable, hand-held, eight-channel demand and energy meter / monitor
Table of Contents

Advertisement

Basic Operation

Basic Operation

Introduction
Battery pack
AC power
source
1-14
Shop for Power Metering products online at:
The normal power source for the Energy Platform is its internal battery pack. The AC
Adapter/Battery Charger is used to charge the battery. Always charge the battery fully
before use. The Energy Platform will always operate on the charger and is designed to
do so, regardless of the state of charge of the battery.
Type: Sealed, rechargeable NiMH (Nickel Metal Hydride) cells.
Length of operation: The Energy Platform can operate on a fully charged battery pack
for more than two (2) hours with the backlight on. When the backlight is turned off, the
unit can operate for more than three (3) hours. For information on how to turn backlight
on or off, see Chapter 4 Instrument Settings - Set Display Preferences.
Charging: The battery pack can be charged by connecting the AC Adapter/Battery
Charger to the Energy Platform. A screen warning will appear during operation when
battery charge is low. A depleted battery pack can be recharged in six (6) hours whether
the unit is on or off. The Battery Charge Indicator glows steadily while charging, and
flashes when fully charged.
NOTE: The Battery Charge Indicator functions whenever the AC Adapter/Battery
Charger is properly connected.
The Energy Platform can be operated from a 50/60 Hz 120/230V AC power source
with or without the battery pack installed.
Connect the AC Adapter output cable to the Input Connector on the right side of the
Energy Platform. Connect the AC Adapter power cord to an appropriate outlet.
Refer to Appendix C for the specifications and replacement of the batteries contained
in Energy Platform.
PowerMeterStore
www.
1.800.561.8187
.ca

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ep1

Table of Contents