Dranetz Energy Platform User Manual page 25

Ortable, hand-held, eight-channel demand and energy meter / monitor
Table of Contents

Advertisement

Install data card
to Energy
Platform
Shop for Power Metering products online at:
The procedure below specifies how to install the data card containing the latest
firmware upgrade to the Energy Platform.
Step
1
Make sure that the unit is off. If not, press the Energy Platform On/Off
power button to turn unit off.
2
Remove the data card from its protective holder and check that the plug
end of card is clean and free of any obstruction.
NOTE: If plug end of card is dirty, clean with static-free, dry, low pressure
air to remove any foreign material causing obstruction of the plug holes.
3
At the bottom of the unit, position the data card with the label facing up
and the plug end facing the Data Card Slot.
4
Insert the card fully into the data card slot until resistance is felt, then
press firmly until card engagement is felt.
NOTE: Do not force the card further into the slot if no card engagement is
felt. Remove card and check if there is foreign object on or in the plug end
of the card. Remove any obstruction. Reinsert program card and repeat
card engagement. If card cannot be engaged, STOP all further action and
call Dranetz Technical Support at 1-800-372-6832 for assistance.
5
Turn the unit on by pushing the on/off button. The loader should display
"Booting from program card". If not, call Dranetz Technical Support
for assistance.
6
The instrument will prompt the user to verify whether or not to upgrade
the firmware. Press Yes and the upgrade procedure will commence. Do
not turn the power off nor remove the data card while firmware upgrade is
in progress.
7
If no errors were detected, a window displaying "Installation Complete"
will pop up. Remove the data card from the unit.
PowerMeterStore
www.
CH 1/ Getting Started
Action
.ca
1-11
1.800.561.8187

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ep1

Table of Contents