Top And Side Views - Dranetz Energy Platform User Manual

Ortable, hand-held, eight-channel demand and energy meter / monitor
Table of Contents

Advertisement

Energy Platform Controls, Indicators, and Connectors, continued
Top and Side
views
Parts table
1-6
Shop for Power Metering products online at:
The top (circuit connection) view features the input voltage and current connectors.
The left side contains the optical interface port. The right side contains the AC adapter
input connector. Both sides have rings for attaching the supplied carrying strap. See
below for descriptions of the top and side connectors.
1
VOLTAGE
INPUTS
600V RMS MAX
Va
11
Part
1
CH A, Voltage Input Connector; color red.
2
CH A, PROBE, Current Input Connector.
3
CH B, Voltage Input Connector; color yellow.
4
CH B, PROBE, Current Input Connector.
5
CH C, Voltage Input Connector; color blue.
6
Neutral, Voltage Input Connector; color white.
7
CH C, PROBE, Current Input Connector.
8
CH D, + Differential Voltage Input Connector; color grey.
9
CH D, - Differential Voltage Input Connector; color white.
10
CH D, PROBE, Current Input Connector.
11
Optical Serial Data Port
12
AC Adapter/Battery Charger Input Connector.
PowerMeterStore
www.
2
3
4
5
6
PROBE
INPUTS
CONNECT ONLY
DRANETZ
ACCESSORIES
Ia
Vb
Ib
Vc
NEUTRAL
Function
7
8
9
10
Ic
Vd (+)
Vd (-)
Id
12
1.800.561.8187
.ca

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ep1

Table of Contents