GE L90 Instruction Manual page 420

L90 line current differential system ur series
Hide thumbs Also See for L90:
Table of Contents

Advertisement

5.10 TESTING
The relay must be in test mode to use the PMU test mode. That is, the
"Enabled" and the
TESTING
During the PMU test mode, the physical channels (VA, VB, VC, VX, IA, IB, IC, and IG), frequency, and rate of change of fre-
quency are substituted with user values, while the symmetrical components are calculated from the physical channels. The
5
test values are not explicitly marked in the outgoing data frames. When required, it is recommended to use the user-pro-
grammable digital channels to signal the C37.118 client that test values are being sent in place of the real measurements.
5-284
PMU 1 IB TEST
MESSAGE
MAGNITUDE: 1.000 kA
PMU 1 IB TEST
MESSAGE
ANGLE: –130.00°
PMU 1 IC TEST
MESSAGE
MAGNITUDE: 1.000 kA
PMU 1 IC TEST
MESSAGE
ANGLE: 110.00°
PMU 1 IG TEST
MESSAGE
MAGNITUDE: 0.000 kA
PMU 1 IG TEST
MESSAGE
ANGLE: 0.00°
PMU 1 TEST
MESSAGE
FREQUENCY: 60.000 Hz
PMU 1 TEST
MESSAGE
df/dt: 0.000 Hz/s
initiating signal must be "On".
TEST MODE INITIATE
L90 Line Current Differential System
Range: 0.000 to 9.999 kA in steps of 0.001
Range: –180.00 to 180.00° in steps of 0.05
Range: 0.000 to 9.999 kA in steps of 0.001
Range: –180.00 to 180.00° in steps of 0.05
Range: 0.000 to 9.999 kA in steps of 0.001
Range: –180.00 to 180.00° in steps of 0.05
Range: 20.000 to 60.000 Hz in steps of 0.001
Range: –10.000 to 10.000 Hz/s in steps of 0.001
TESTING
TEST MODE FUNCTION
5 SETTINGS
setting must be
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents