Mounting And Commissioning - Siemens Siprotec 7UM611 Manual

Multi-functional generator protection relay 7um61 series
Table of Contents

Advertisement

Mounting and Commissioning

This chapter is intended for experienced commissioning staff. They should be familiar
with the commissioning of protection and control equipment, with operation of the
power system network and with the safety rules and regulations. Certain adaptations
of the hardware to the power system specifications may be necessary. For primary
testing, the object to be protected (generator, motor, transformer) must be started up
and in put into service.
3.1
3.2
3.3
3.4
7UM61 Manual
C53000-G1176-C127-3
Mounting and Connections
Checking Connections
Commissioning
Final Preparation of the Device
3
234
255
262
291
233

Advertisement

Table of Contents
loading

This manual is also suitable for:

Siprotec 7um612

Table of Contents