Mounting and Commissioning
SIPROTEC 4, 7SJ62/63/64 Handbuch
C53000-G1140-C147-A, Edition 07.2015
This chapter is intended for experienced commissioning staff. The staff must be famil-
iar with the commissioning of protection and control systems, with the management of
power systems and with the relevant safety rules and guidelines. Hardware modifica-
tions that might be needed in certain cases are explained. The primary tests require
the protected object (line, transformer, etc.) to carry load.
3.1
Mounting and Connections
3.2
Checking Connections
3.3
Commissioning
3.4
Final Preparation of the Device
3
365
415
420
440
364