Installation; Installation Summary; Unpacking And Inspecting - Olicom CrossFire 8720 Installation Manual

Fast ethernet layer 3 switch
Table of Contents

Advertisement

2.2 Installation

This chapter contains step-by-step instructions for installing, connecting and
verifying that the switch is operating properly.

2.2.1 Installation Summary

The installation sequence is listed in the steps below.
1. Plan for installation. Read Preparing for Installation on page 7.
2. Unpack the switch.
3. Gather materials.
4. If you will be installing expansion modules, install them now.
5. Mount the switch.
6. Connect the switch to the network.
7. Verify the operation of the switch.
8. Configure the switch.

2.2.2 Unpacking and Inspecting

Immediately after receiving the equipment, examine all shipping containers and
contents for damage. If any damage has occurred, notify the shipping carrier.
Unpack the unit by removing the packing material and lifting it from its protective
enclosures. Visually examine the equipment and check the container for related
parts and accessories. You should have the following items:
One CrossFire 8720 Fast Ethernet Switch.
One CrossFire 8720 Fast Ethernet Layer 3 Switch Guide to Operations (this
guide).
One OC-8720 Fast Ethernet Switch Program Disk Set.
One serial cable for the management port.
One plastic bag containing four adhesive rubber feet and rack mounting
screws, Allen key, nuts and washers.
Report any missing parts and any damage not related to shipping to your customer
service representative.
Note: Keep the packing materials for future use. All components returned under
warranty should be shipped in their original packing materials.