Filling With Working Material; Working; Spraying; Working Break - WAGNER Cobra 40-10 Operating Manual

High pressure double diaphragm pump
Table of Contents

Advertisement

EDITION 01/2012
OPERATING MANUAL
5.2.3

FILLING WITH WORKING MATERIAL

1. Place suction hose (7) with return tube (4) in the
container with working material (6).
2. Set pressure regulator (1) to approx. 0.05 MPa;
0.5 bar; 7.25 psi.
3. Open return valve (3)
4. Slowly open ball valve (2).
5. Adjust the air pressure on the pressure regulator (1)
so that the pump runs regularly.
6. Close ball valve (2) as soon as pure working material
starts coming from the return hose.
7. Set return valve (3) to "spray" .
8. Point the gun, without nozzle, into container (5) and
open it.
9. Slowly open ball valve (2).
10. Close ball valve (2) as soon as pure working material
starts coming from the gun.
11. When there is no pressure remaining in the system
close gun.
12. Secure gun.
5.3

WORKING

5.3.1

SPRAYING

1. Secure gun and place nozzle in the gun.
2. Slowly open ball valve (2).
3. Set required working pressure on the pressure regulator (1).
4. Optimize the spraying results as laid down in the gun instructions.
5. Start work process.
Note: Functionally it is permissible, that the pump runs 1 - 6 DS/min after, when the
gun is closed.
5.3.2

WORKING BREAK

1. Close gun.
2. Close ball valve (2).
3. Release the system by opening the gun.
4. Close and secure gun.
If the system has been used with two component material:
Hardened material in the spraying system when 2-component
material is worked!
Destruction of the pump and injection system
SIHI_0013_GB
PART NUMBER DOC322851
WARNING
Follow the manufacturer's working instructions, particularly re -
garding the pot life.
Rinse thoroughly before the end of the pot life.
Cobra.
Ball valve closed
Circulation
mode
Return valve
B_01217
Ball valve open
Spraying
mode
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cobra 40-25

Table of Contents