Mounting instruction Genius
1. Switch on the on/off switch on the back of the evaporation controller.
2. Switch on the on/off switch
3. Check that the green LED
supply is on.
4. Check on the remote control that the status for all interlocks is OK.
Press the green button
when the high voltage is on and the high voltage setting is shown. An emission current does
not flow.
N O T I C E !
overall system .
7.5

Switching off

Switch off the system as follows:
1. Switch off the high voltage by pressing the button
The
HV-OFF
button lights up.
2. Switch off the mains power supply with the on/off switch on the back of the evapora­
tion controller.
N O T I C E !
overall system.
D A N G E R !
rod, before touching it to discharge any charges that might have built up.
7.6

Data structure

All data is stored in the structure illustrated in Fig. 11
Version 2.0.6
MAIN
on the HVP.
INTERLOCK
HV ON
on the remote control to switch on the high voltage. It blinks
Consider the operation manuals of the components of the
Consider the operating manuals of the components of the
Ground the electron beam evaporator with the grounding
30/78
(Safety switch) on the high voltage power
HV-OFF
on the remote control.