Mounting instruction Genius
1. Check
-
the ground connections
-
the power supply cable,
-
the control cables and
-
the high voltage cable
for correct cabling and firm connection.
2. Check the safety circuit.
3. Check the emergency-stop system.
D A N G E R !
via an external control system, it is possible that there is already a
high voltage at the output of the HVP when the mains power is switched
on if the system is set on automatic operation.
D A N G E R !
a current of up to +/- 3A can already exist at the magnet current
output
X117
to the specifications of the magnet coils and limit the output current in the
menu "Set Data-Limits" if necessary before connecting the output X117.
7.2

General operation

7.2.1
Operating – and display elements
1
5
Fig. 8: LCD-remote control
The remote control is fastened to a hook on the front panel of the evaporation controller. It
can be taken off the evaporation controller when needed.
Version 2.0.6
If the evaporation controller
Depending on the magnet current setting selected,
when the mains power has been switched on. Pay attention
6
3
2
27/78
is being operated
G
ENIUS
6
4
Ferrotec GmbH

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for ferrotec genius

Table of Contents