Figure 4-22. Battery Shunt Trip Terminal Detail; Table 4-4. Battery Shunt Trip Connections And Wire Terminations - Eaton 93PM-L Installation And Operation Manual

20-120 kw (208v)
Hide thumbs Also See for 93PM-L:
Table of Contents

Advertisement

Figure 4-22. Battery Shunt Trip Terminal Detail

Table 4-4. Battery Shunt Trip Connections and Wire Terminations

Terminal Name
5
48 Vdc Battery Shunt Trip (–)
6
48 Vdc Battery Shunt Trip (+)
Eaton 93PM-L UPS (20–120 kW, 208V) Installation and Operation Manual P-164000688—Rev 02
Shunt Trip Terminals
(See Figure for terminal
assignments.)
Description
Output: Contacts used to open battery
breaker or disconnect
Recommended
Size of Pressure
Minimum Wire Size
Termination
Twisted Pair Wires #18
#1430 AWG
AWG
www.eaton.com/powerquality
UPS System Installation
Tightening Torque
2 lb in
(0.22-0.25 Nm)
4-31

Advertisement

Table of Contents
loading

Table of Contents