Cisco Nexus 7718 Hardware Installation Manual page 49

Table of Contents

Advertisement

Installing the Chassis
Step 5
Install a grounding cable between the left hand side door for the I/O modules and the switch chassis, as shown
in
Figure
I/O modules and the switch chassis.
Figure 15: Grounding Cable Location between the Left Hand Side Door for the I/O Modules and the Cisco Nexus 7718
Switch Chassis
Note
1
Grounding cable
OL-30453-01
11. Repeat the procedure for installing a grounding cable between the right hand side door for the
The grounding cable location for installing the grounding cable between the right hand side door for
the I/O modules and the Cisco Nexus 7718 switch chassis will be mirrored on the right hand side of
the switch.
Cisco Nexus 7718 Switch Site Preparation and Hardware Installation Guide
Grounding the Front ID Doors
2
M4 screw
39

Advertisement

Table of Contents
loading

Table of Contents