Installing the Chassis
Step 2
Install grounding cables to the left side of the power supply door, as shown in
plate with the top and bottom hinges.
Figure 13: Grounding Cable Locations on the Door for the Power Supplies
1
M4 screw
3
M4 screw
OL-30453-01
2
Flat washer
4
Grounding cable
Cisco Nexus 7718 Switch Site Preparation and Hardware Installation Guide
Grounding the Front ID Doors
Figure
9, to connect the middle
37