Cisco Nexus 7718 Hardware Installation Manual page 37

Table of Contents

Advertisement

Installing the Chassis
Step 3
Use the mechanical lift to position the chassis in front of the four-post rack or cabinet and elevate the chassis
to the level of the bottom-support rails or no more than 1/4 inch (0.6 cm) above the bracket.
Step 4
Make sure that the chassis is positioned with the rear (the side with the open power supply slots) ready to go
into the rack or cabinet first. If necessary, you can use the two handles on either side of the chassis to move
the chassis on the lift.
Step 5
Use two persons to push the chassis halfway onto the rack or cabinet and use one person to guide the chassis
down the bottom-support brackets while making sure that the chassis does not get caught on any edges of the
bottom support brackets.
OL-30453-01
Cisco Nexus 7718 Switch Site Preparation and Hardware Installation Guide
Installing a Chassis in a Rack or Cabinet
27

Advertisement

Table of Contents
loading

Table of Contents