Belair 100SN Installation Manual page 56

Table of Contents

Advertisement

BelAir100SN Installation Guide
May 18, 2010
Table 11: LED Indicator Description - BelAir100SN (Continued)
LED
Colour
Cable
Off
Modem
or
Flashing
Ethernet
Blue
Blue
Green
Flashing
Green
Confidential
Document Number BDTK11001-A01 Preliminary
State
Description
Not
Cable Modem link is down.
operational
Initialization
Synchronizing with the Cable Modem
Termination System (CMTS). May
take up to 5 minutes.
After 5 minutes, this state indicates
that the RF signal strength is out of
range, the MAC address may not be
recorded at the CMTS or an IP
address may not be assigned to the
unit.
Note the unit's MAC address located
at the bottom of the unit and call the
Network Operating Centre to
confirm MAC address registration
and IP address assignment.
After verifying the IP address, check
L2TP tunneling configuration.
Operational
Cable Modem is operational
Not
Cable Modem link is down. A cable is
operational
connected between the Ethernet
port and an active far-end.
Not
Cable Modem link is down. Data is
operational
being transferred across the Ethernet
link.
Troubleshooting
Page 56 of 75

Advertisement

Table of Contents
loading

Related Products for Belair 100SN

This manual is also suitable for:

100s

Table of Contents