Before You Install The Belair100Sn; Deployment Process; Step 1-Plan And Document Your Network - Belair 100SN Installation Manual

Table of Contents

Advertisement

BelAir100SN Installation Guide

Before You Install the BelAir100SN

Deployment
Process
Step 1—Plan and
Document your
Network
May 18, 2010
Before you install the BelAir100SN, be sure to read and understand all the
material in this guide. Failure to do so may result in injury or equipment
damage. BelAir Networks assumes no liability for improperly installed
equipment.
This chapter describes the following information that you must know before
you can install the BelAir100SN:
"Deployment Process" on page 21
"Minimum Required Information" on page 22
"Installation Safety Information" on page 23
"Installation Prerequisites" on page 26
BelAir Networks strongly recommends that you use the following process to
install and deploy your units:
1 Plan your network and document your planning decisions.
2 Prepare your network servers to use BelAir auto-configuration.
3 Physically install the units.
4 Commission the units.
5 Perform acceptance tests.
Thoroughly planning your network and recording your planning decisions
greatly reduces the number of potential issues while installing and configuring
your network. Planning your network consists of the following two distinct
tasks:
1 RF planning and site survey. This task determines the following items:
—the country of operation
—the type of solution that is required (hospitality, campus, metro or other)
—how many BelAir units are required
—how many access radios and backhaul radios each unit will have
—what radio settings are required (radio channels, power levels, antenna
orientation)
—how are the units going to be mounted
—what accessories are needed
Confidential
Document Number BDTK11001-A01 Preliminary

Before You Install the BelAir100SN

Page 21 of 75

Advertisement

Table of Contents
loading

This manual is also suitable for:

100s

Table of Contents