11-1. First Confirmation
11-1-1. Confirmation of Power Supply
Confirm that the power breaker operates (ON) normally.
11-1-2. Confirmation of Power Voltage
Confirm that power voltage is AC 220–230–240 ± 10%.
If power voltage is not in this range, the unit may not operate normally.
11-1-3. Operation Which is not a Trouble (Program Operation)
For controlling the air conditioner, the program operations are built in the microcomputer as described in the
following table.
If a claim is made for running operation, check whether or not it meets to the contents in the following table.
When it does, we inform you that it is not trouble of equipment, but it is indispensable for controlling and main-
taining of air conditioner.
No.
Operation of air conditioner
1
When power breaker is turned "ON", the
operation indicator (white) of the indoor
unit flashes.
2
Compressor may not operate even if the
room temperature is within range of
compressor-ON.
3
In Dry and ECO mode, FAN (air flow)
display does not change even though FAN
(air flow select) button is operated.
4
In AUTO mode, the operation mode is
changed.
Table 11-1-1
The OPERATION lamp of the indoor unit flashes when
power source is turned on. If [
operated once, flashing stops.
(Flashes also in power failure)
The compressor does not operate while compressor
restart delay timer (3-minutes timer) operates.
The same phenomenon is found after power source has
been turned on because 3-minutes timer operates.
The air flow indication is fixed to [AUTO].
After selecting Cool or Fan only, select an operation
mode again if the compressor keeps stop status for 15
minutes.