M/A-Com M7100IP Series Installation Manual page 47

Hide thumbs Also See for M7100IP Series:
Table of Contents

Advertisement

14. For Each Relay: Connect one end of a #18 AWG red wire to the relay,
Pin 86. Cut the lead to length, and connect the other end to the 1 amp fuse
holder supplied. Use crimp on connectors supplied. Connect the other
side of the 1 amp fuse holder to the A+ battery source or a vehicle A+
fuse block. Use a #18 AWG red wire and a ring lug supplied, if needed
(Refer to Figure 27).
15. Check dual control operation, using the operator's manual as a test guide.
In the PC programming software, make sure the "DUAL CONTROL
SPEAKER" is programmed ACTIVE HIGH.
IP
Figure 26 – M7100
Dual Control Unit Remote Mount/Remote Mount
Installation Configuration
47

Advertisement

Table of Contents
loading

Table of Contents