Auxiliary grid/genset connection

10. Auxiliary grid/genset connection
This chapter explains the requirements and process for connecting the auxiliary grid/genset to the unit. Read
carefully before starting the connection process.

10.1. Safety instructions for connecting the auxiliary grid/genset

Before you start to make the connections, make sure there is no voltage in the inverter. Check that
the AC protection of the auxiliary grid/genset and the DC switch are open.
Do not switch on the power to the unit until you have successfully made the rest of the connections
and the unit is closed.

10.2. Wiring requirements for connecting the auxiliary grid/genset

The wiring gauge for connecting the auxiliary grid/genset is specified in the following table:
Auxiliary grid/genset wiring gauge
Cable diameter

10.3. Auxiliary grid/genset connection process

To connect the auxiliary grid/genset:
1.
Loosen the packing gland marked GRID/GENSET (see section "2.7. Description of wiring inlets"), remove
the cap and pass the consumption grid cable through it.
2.
Open the clamp-type terminals J55 GRID/GENSET, insert the respective cables respecting the polarity
and close said terminals. Ingeteam recommends using a tubular terminal in accordance with DIN 46 228/1.
3.
Correctly tighten the packing glands to prevent losses to the protection class, verifying that the wiring is
not taut. Check that the connection is tight.
ABH2013IQM01_A - Installation and Operation Manual
INGECON SUN STORAGE 1Play
6 ~ 16 mm
2
9 ~ 17 mm
L
Live
N
Neutral
Ground