Ingeteam INGECON SUN STORAGE 1Play 3 Installation And Operation Manual page 72

Single-phase battery inverter
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 55
Ingeteam
3.
Mark the bottom fixing hole. Remove the inverter and drill the hole. Fit the inverter again and bolt the
bottom fixing.
4.
Check that the unit properly secured.
Units with a transformer
1.
Mark the fixing points for the plates on the wall and drill holes with a suitable bit for the screws to be
used to secure the plate to the wall later.
2.
Fix the plate using stainless steel fittings to prevent corrosion.
3.
Suspend the transformer from the plate and make sure it fits properly. This operation must be carried out
by two people due to the weight of the transformer.
72
ABH2013IQM01_A - Installation and Operation Manual
Installing the unit

Advertisement

Table of Contents
loading

Table of Contents