Ingeteam INGECON SUN STORAGE 1Play 3 Installation And Operation Manual page 69

Single-phase battery inverter
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 55
Preparation for installing the unit
For TL models, the distance between drilled holes will be as follows:
In models with transformers, it is the transformer which will be secured to the wall. The inverter will subsequently
be fixed to the transformer.
Drill the upper three holes before hanging the transformer and the lower three holes after hanging it, as explained
in Section "7.2. Attaching the unit to the wall". See the measurements in the following figure.
ABH2013IQM01_A - Installation and Operation Manual
80
200
100
100
80
Ingeteam
DE
EN
ES
FR
IT
PT
69

Advertisement

Table of Contents
loading

Table of Contents