20.2. Display

The following figure shows the main screen of the inverter and the meaning of each field.
a.
Current time, hh:mm.
b.
Current date, dd/mm/yy.
c.
Storage system data. The voltage in volts,
current in amps and charge status is shown
alternately. If COM is shown in place of these
values, there is no communication with the storage
system manager.
d.
PV array data. The voltage in volts and current
in amps of the PV array is shown alternately.
e.
Current power percentage. The letter indicates
the reason for the power limitation.
In the event that the inverter is connected to a grid or auxiliary generator the current power percentage and the
(1)
most restrictive reason for power limitation are shown. The various reasons for limiting the power are explained
subsequently:
M
Limitation due to user settings.
B
Limitation due to the storage system charge status.
T
Limitation due to high temperature in the unit.
D
Auxiliary grid/genset input availability.
C
Limitation due to external communication.
90
a
10:23 AM
10:23 AM
c
d
h
(1)
b
1/23/2015
1/23/2015
e
f
g
i
f.
Consumption grid output data. The power in
Watts and the voltage in volts is shown alternately.
g.
Auxiliary grid/genset input data. The power in
Watts and the voltage in volts of the auxiliary grid/
genset is shown alternately.
h.
Phase of the three-phase system. In the
event that the inverter is operating in a three-phase
system the phase in which it is operating will be
indicated (R, S or T).
i.
This indicates that the system is operating
to the interface setting. If the symbol flashes, this
means that communications have been lost. As a
result, the display will switch to standby.
ABH2013IQM01_A - Installation and Operation Manual
Display control

Advertisement

Table of Contents
loading

Table of Contents