Operation Mode - Ingeteam INGECON SUN STORAGE 1Play 3 Installation And Operation Manual

Single-phase battery inverter
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 55
Ingeteam
Scheduling
Allows the inverter to be manually connected to the auxiliary grid/genset in accordance with the scheduling
established.

20.7.4. Operation Mode

This menu is for selecting the strategy to be used in the installation and configuring its parameters.
>
The
symbol points to the option selected. To select the desired option and configure it, press
once it is highlighted.
Stand-Alone
The inverter generates an alternative stand-alone grid and acts as a grid manager, guaranteeing the balance
between generation, consumption and the storage system. In order to do this, it controls the energy flow between
the grid and the batteries in accordance with the situation at all times. It enables a solar energy source to be
integrated into the grid using INGECON SUN inverters. The control system manages the power produced by the
photovoltaic inverters, based on the consumption data and the battery charge status. The auxiliary generation
source (a generator or the public grid) only connects when the battery charge status is below a specific,
programmable level.
Self consumption
This operating mode is intended for grid connection systems with renewable energy sources, in order to minimize
consumption from the grid. If energy production is greater than demand, the excess can be used to charge the
batteries or to inject into the grid if the batteries are completely charged.
If the loads require more energy than that produced by the renewable sources, the batteries will be in charge of
satisfying this demand, increasing the self-consumption ratio.
Grid support
In conjunction with INGECON EMS Manager, the INGECON SUN STORAGE 1Play inverter can adapt the output
power of the PV plant to a pre-set value, enabling a constant power value to be achieved or the power variation
ramp to be controlled.
UPS (backup)
This operating mode was designed for systems connected to the grid, where grid outages are long and frequent,
and an auxiliary energy source is necessary. The INGECON SUN STORAGE 1Play inverter operates connected to
the alternative grid. In order to guarantee an energy source, the inverter keeps the batteries charged. During a grid
outage the battery inverter generates the AC grid and the energy stored in the batteries is used to supply the loads.
If there are sources of renewable energy connected to the grid and the energy generated is greater than the
demand, the excess can be injected into the grid.
For all the previously mentioned modes the following parameters must be set:
Parameter
SOCMAx
Maximum charge limit of renewable sources. In Stand-Alone mode the auxiliary grid/genset
input is deactivated.
SOCRED
Maximum charge limit from the auxiliary grid/genset input.
SOCMIN
Minimum limit for switching to standby. In Stand-Alone mode the auxiliary grid/genset
input is activated.
SOCRECx
Value at which, once passed, the unit starts generation in the consumption grid, as long as
the SOCDESCx (SOCRECx ≤ SOCMIN). has been previously reached.
SOCDESCx
Minimum limit for switching to the shutdown status (SOCDESCx ≤ SOCRECx).
CHARGING
Maximum battery charging power, in Watts.
POWER
GRID POWER
Grid Power, in Watts. It can be positive or negative:
96
Positive: maximum power injected into the grid.
Negative: minimum power consumed from the grid.
Explanation
ABH2013IQM01_A - Installation and Operation Manual
Display control
on the option

Advertisement

Table of Contents
loading

Table of Contents